SIL 801
Service Bulletin/Repair Instructions
Altec has learned that the fender rubber on certain units built from July 2020 to October 2020 can become detached from the wheel well fender cutout of the utility body. Altec recommends that all fender rubber be inspected using the inspection procedure described in the SIL. If the installed fender rubber does not pass inspection, order and install the Fender Rubber Replacement Kit. If the fender rubber passes the inspection, complete the Inspection Sheet at the end of this document. No additional inspections are required.
SIL 785
Service Bulletin/Repair Instructions
Altec has discovered that affected units may not have a PTO request wire properly connected to the transmission control module. Without this wire installed, the chassis may not produce the hydraulic pressure required for proper PTO clutch pack engagement. Altec requires the unit to be inspected for the PTO request wire no later than the next periodic maintenance interval or 90 days from the receipt of the SIL, whichever comes first. If the inspection procedure in the SIL confirms that the PTO request wire is missing, order the PTO Request Wire Kit and install the kit no later than 6 months from the receipt of this SIL.