SRP 22-074
Service Bulletin/Repair Instructions
Standard repair procedure (SRP) - Filon roof damage repair instructions.
Vehicle report
Technical service bulletins are instructions a manufacturer sent its dealers about a known fault. They are not recalls and the work is usually not free, but they are the clearest signal of a problem the manufacturer already knows about.
SRP 22-074
Standard repair procedure (SRP) - Filon roof damage repair instructions.
INC 22-067
JAYCO AND ENTEGRA COACH STORAGE TIPS. INSTRUCTIONS FOR STORING JAYCO AND ENTEGRA COACH DIESEL PUSHERS.
INC 21-038
Equalizer leveling jack manual override procedure. INSTRUCTIONS FOR OVERRIDE MODE ON EQUALIZER LEVELING SYSTEM.
INC 20-007
Informational bulletin for repair that requires the removal of pullout cabinet extension drawers.
19-047
Freightliner Chassis - Detroit Diesel Corp Field Service Campaign D19M4 - Different I-Beam design was introduced on the axles that does no have a flat mating surface on the bottom side of the I-beam where the optional stabilizer brackets are mounted. This may result in damage to the stabilizer bracket due to bending stress during assembly of the U-bolts. Inspection of the stabilizer brackets and I-beams for damage may require installation of spacers and replacement of the stabilizer brackets and mounting hardware. A Detroit Diesel Authorized Repair Facility will perform this service at no charge prior to September 26, 2020.
16-025
Girard Water heater requires inspection for possible replacement of the gas valve. - an intermittent occurrence when the gas valve is not openig to light the burner of the water heater. Confirmation of old valve to be replaced is when inspection finds solid balck solenoids . New valve will have white rings around the top of each solenoid and does NOT require replacement.
Complaint counts are reports filed with NHTSA, not failure rates. A common model collects more of them than a rare one that breaks more often.