Technical service bulletins are instructions a manufacturer sent its dealers about a known fault. They are not recalls and the work is usually not free, but they are the clearest signal of a problem the manufacturer already knows about.
REL-IB-027
Other
McNeilus Truck and Manufacturing provides these instructions for replacing hardware on the front ejector shoes of a Rear Loader refuse vehicle in order to create greater clearance between the hardware and the ejector track. The potential clearance issue is specific to vehicles with hex head fasteners at the front lower and upper ejector shoes.
MISC-IB-084-A
Service Bulletin/Repair Instructions
McNeilus Truck and Manufacturing requires an inspection and replacement, if needed, to ensure the Bob Tail® Huck® bolts are fully swaged with correct thread exposure on the rear pivot cross member body mounts. Revision A updates the replacement bolt length to 90mm
MISC-IB-084
Service Bulletin/Repair Instructions
McNeilus Truck and Manufacturing requires an inspection and replacement, if needed, to ensure the Bob Tail® Huck® bolts are fully swaged with correct thread exposure on the rear pivot cross member body mounts.
MISC-TSIB-081
Service Bulletin/Repair Instructions
According to an amended ruling in the visual inspection labeling requirement in Federal Motor Vehicle Safety Standard (FMVSS) No. 304, the periodic inspection interval for compressed natural gas (CNG) fuel containers has been modified to âat least every 12 months.â McNeilus Truck and Manufacturing will support this change by updating safety decals and installing these new decals when a vehicle is inspected by McNeilus CNG technicians, and by answering questions regarding this periodic inspection interval update and how McNeilus will support it.
MISC-TSIB-079
Service Bulletin/Repair Instructions
McNeilus Truck and Manufacturing provides these instructions for installing a hydraulic reservoir cork gasket. The installation of this gasket will repair leaks coming from the gasket between the in-tank filter and the reservoir.
REL-TSIB-024
Service Bulletin/Repair Instructions
If you are experiencing repeated failures of the main pressure tube (PN 1137938 or PN 1597692) at or near the welded saddle port and have replaced the tube, McNeilus Truck and Manufacturing offers these instructions for an alternate option to help reduce the repeated failures of the tube. The instructions are to replace the ejector force limited tube (PN 1137935), which attaches to the main pressure tube (PN 1137938 or PN 1597692), with a flexible hose. A flexible hose may allow for less tension on the rigid tube and help reduce frequent failures. A flexible hose 14â-16â in length will be required. This flexible hose may be purchased from McNeilus Parts.
MISC-TSIB-078
Service Bulletin/Repair Instructions
McNeilus Truck and Manufacturing offers these instructions for ejector cylinder bypass testing.
MISC-TSIB-073
Service Bulletin/Repair Instructions
This technical service information bulletin lists instructions to replace the hydraulic vane pumps on McNeilus front and rear loading refuse collection trucks with a longer life hydraulic pump. The hydraulic pump powers vehicle body functions for refuse collection.