Vehicle report

2016 MCNEILUS XE REAR LOADER

Service bulletins

6 bulletins

Technical service bulletins are instructions a manufacturer sent its dealers about a known fault. They are not recalls and the work is usually not free, but they are the clearest signal of a problem the manufacturer already knows about.

MISC-IB-084-A

Service Bulletin/Repair Instructions

McNeilus Truck and Manufacturing requires an inspection and replacement, if needed, to ensure the Bob Tail® Huck® bolts are fully swaged with correct thread exposure on the rear pivot cross member body mounts. Revision A updates the replacement bolt length to 90mm

MISC-IB-084

Service Bulletin/Repair Instructions

McNeilus Truck and Manufacturing requires an inspection and replacement, if needed, to ensure the Bob Tail® Huck® bolts are fully swaged with correct thread exposure on the rear pivot cross member body mounts.

MISC-TSIB-081

Service Bulletin/Repair Instructions

According to an amended ruling in the visual inspection labeling requirement in Federal Motor Vehicle Safety Standard (FMVSS) No. 304, the periodic inspection interval for compressed natural gas (CNG) fuel containers has been modified to “at least every 12 months.” McNeilus Truck and Manufacturing will support this change by updating safety decals and installing these new decals when a vehicle is inspected by McNeilus CNG technicians, and by answering questions regarding this periodic inspection interval update and how McNeilus will support it.

MISC-TSIB-079

Service Bulletin/Repair Instructions

McNeilus Truck and Manufacturing provides these instructions for installing a hydraulic reservoir cork gasket. The installation of this gasket will repair leaks coming from the gasket between the in-tank filter and the reservoir.

REL-TSIB-024

Service Bulletin/Repair Instructions

If you are experiencing repeated failures of the main pressure tube (PN 1137938 or PN 1597692) at or near the welded saddle port and have replaced the tube, McNeilus Truck and Manufacturing offers these instructions for an alternate option to help reduce the repeated failures of the tube. The instructions are to replace the ejector force limited tube (PN 1137935), which attaches to the main pressure tube (PN 1137938 or PN 1597692), with a flexible hose. A flexible hose may allow for less tension on the rigid tube and help reduce frequent failures. A flexible hose 14”-16” in length will be required. This flexible hose may be purchased from McNeilus Parts.

MISC-TSIB-078

Service Bulletin/Repair Instructions

McNeilus Truck and Manufacturing offers these instructions for ejector cylinder bypass testing.

Reading this report

Complaint counts are reports filed with NHTSA, not failure rates. A common model collects more of them than a rare one that breaks more often.

2016 Mcneilus Xe Rear Loader Service Bulletins: 6 bulletins | CarFathom